    The Engineering Department will generally recommend the award of a Contract to the Approving Authority (City Commission or other authority that will make the Contract award) within 30-45 days after bid opening. However, for a specific date that a project will be considered for award by the Approving Authority, please contact the Engineering Department at (616) 456-3060 and request to speak to the appropriate project manager.

    Please Note:

    The Approving Authority reserves the right to award a Contract in the Approving Authority's best interest, and therefore, may select a Bidder other than the lowest. The following is a list of the Bid Tabs for the most recent projects bid through the City Engineer's Office. For the desired project, click the black check circle to view or print the associated Invitation to Bid and the green check circle to view or print the Bid Tab.
    Prior Year Bid Tabs: 2015 2014 2013 2012 2011 2010 2009
     
    Bid Date Project File # Project Name View Inv to Bid Eng Estimate​ Contact​ ​View Bid Tab
    ​12/22/16 ​16093 ​Trench Repairs over Water and Sewer Lines, Curb Repair, Parking Lot Repair and Traffic Calming at VARIOUS LOCATIONS - Contract No. 2016-1 $742,975.00​ J. Brom​​​
    ​11/1/16 16044​​ ​Pool Demolition at GARFIELD, HIGHLAND and LINCOLN PARK $347,014.00​ ​​​K. Enriquez
    11/1/16​​ 15063​​ ​Electrical Switchgear Preventative Maintenance and Asset Management Plan for 223 Washington Street SE (CARC), 300 Monroe Ave NW (City/County Complex), and 1 Monroe Center NW (Grand Rapids Police Dept) $57,500.00 D. Kuzee​​

    7/26/16​ ​15095 ​Reconstruction of DORCHESTER AVENUE from Hall Street to Oxford Street $882,924.00​ ​B. Stam
    8/2/16​ ​15007 ​Improvements at RICHMOND PARK Shelter House Renovation and Walkway Development $185,525.00​​ ​K. Enriquez
    8/4/16​ ​14034 ​Improvements to GRAND RIVER FLOODWALL CONTRACT NO. 2 (Freeboard and Embankment Protection Improvements) $2,690,470.00​ K. Pfauth
    ​7/12/16 ​16032 ​Reconstruction of HASTINGS STREET, PROSPECT AVENUE, and TROWBRIDGE STREET (GVSU 500 Lafayette) $924,931.00​ R. DeVries​​
    ​6/30/16 16042​ ​​Rotomilling/Resurfacing of Streets at VARIOUS LOCATIONS - Contract 2016-4 ​$3,043,812.50 R. DeVries
    ​6/23/16 ​16024 ​Improvements to the East Paris Reservoir $690,020.00​ D. Kuzee
    ​6/21/16 ​16041 ​Rotomilling/Resurfacing of Streets at VARIOUS LOCATIONS - Contract 2016-3 ​$2,218,135.00 ​R. DeVries
    ​6/14/16​ 16036​ ​Rotomilling/Resurfacing of Streets at VARIOUS LOCATIONS - Contract 2016-2 ​$2,625,265.00 ​​​R. DeVries
    5/26/16​ ​16026 ​Rotomilling/Resurfacing of Streets at VARIOUS LOCATIONS - Contract 2016-1 $1,653,107.00​ ​​​R. DeVries
    ​5/24/16 16006​ ​​Construction of Sidewalk, Drive Approach, Curb, Curb and Gutter, and ADA Ramp at VARIOUS LOCATIONS - CONTRACT NO. 2016-5 $182,260.00​ J. Hayes
    ​5/24/16 ​16005 ​Construction of Sidewalk, Drive Approach, Curb, Curb and Gutter, and ADA Ramp at VARIOUS LOCATIONS - CONTRACT NO. 2016-4 $182,260.00​ J. Hayes
    ​5/26/16 15052​​ ​Water Main Replacement in Crescent Street from Barclay Avenue to Lafayette Avenue $​259,834.00​ ​B. Stam
    6/6/16​​ ​15018 ​Reconstruction of OAKDALE STREET from Eastern Ave to Kalamazoo Ave $1,575,677.00​ D. Siminski​
    5/24/16​ 15010​​ ​Reconstruction of NATIONAL AVENUE from Lake Michigan Dr to Sibley St and STRAIGHT AVENUE from Fulton St to Lake Michigan Dr ​$981,915.00​ D. Siminski​
    ​5/10/16 ​14100 ​Reconstruction of CLANCY AVENUE from Cedar Street to North Creston Plaza Drive ​$958,285.00 ​R. DeVries
    5/​3/16 ​15036 Reconstruction of COTTAGE GROVE STREET from Buchanan Avenue to Division Avenue ​$811,048.00 D. Siminski​
    4/26/16 ​16011 ​Brick Pavement Repair at LAKE DRIVE and WEALTHY STREET and Crack, Joint and Concrete Pavement Repair at VARIOUS LOCATIONS - Contract No. 2016 ​$755,169.00 J. Hayes
    ​3/29/16 ​15053 Reconstruction of TAYLOR AVENUE from Grove St. to Sweet St. and HOWLAND STREET (VACATED) from Monroe Ave. to Taylor Ave. and SWEET STREET from Center Ave. to Plainfield Ave. and QUEEN AVENUE from Sweet St. to Sweet St. Alley $3,732,137.00​ J. McCaul
    3/15/16​​ 15097​​ ​Improvements in ANN STREET from Turner Ave to US-131 Northbound Ramp and in TURNER AVENUE from Ann St to US-131 Southbound Ramp ​$291,974.00​ ​B. Stam
    3/3/16​​ ​15068B ​Improvements to CAMELOT, CAMPAU, and MULICK Parks $1,093,582.00​ K. Enriquez
    3/3/16​​ ​15068A ​Improvements to DICKINSON BUFFER, DOUGLAS, and MARY WATERS Parks $1,078,734.40​ ​K. Enriquez
    ​2/25/16 ​14014 ​Eastside Sewer Improvements Program Separation Project Contract No. 28A $3,803,808.00​ ​R. DeVries
    2/16/16​ 15082​ ​Improvements to SCRIBNER PARKING LOT $160,710.00​ J. Brom​​
    2/18/16​ ​15025 ​Streetscape Improvements in PEARL STREET from Mt Vernon Ave to the Grand River $547,812.50​ ​B. Stam
    ​2/2/16 16002​ Construction of Sidewalk, Drive Approach, Curb, Curb and Gutter, and ADA Ramps at VARIOUS LOCATIONS - CONTRACT NO. 2016-1 North $182,260.00 J. Hayes
    2/2/16​ 16003​​ ​Construction of Sidewalk, Drive Approach, Curb, Curb and Gutter, and ADA Ramps at VARIOUS LOCATIONS, - CONTRACT NO. 2016-2 South ​$182,260.00 J. Hayes
    1/19/16​​ ​14063​ ​​​Improvements to the North Aeration Flow Distrubtion Structure at the WATER RESOURCE RECOVERY FACILITY ​$2,100,000.00​ ​J. Hayes