    The Engineering Department will generally recommend the award of a Contract to the Approving Authority (City Commission or other authority that will make the Contract award) within 30-45 days after bid opening. However, for a specific date that a project will be considered for award by the Approving Authority, please contact the Engineering Department at (616) 456-3060 and request to speak to the appropriate project manager.

    Please Note:

    The Approving Authority reserves the right to award a Contract in the Approving Authority's best interest, and therefore, may select a Bidder other than the lowest. The following is a list of the Bid Tabs for the most recent projects bid through the City Engineer's Office. For the desired project, click the black check circle to view or print the associated Invitation to Bid and the green check circle to view or print the Bid Tab.
    Other Year Bid Tabs: 2016 2014 2013 2012 2011 2010 2009
    Bid Date Project File # Project Name View Inv to Bid Eng Estimate​ Contact​ ​View Bid Tab
    11/25/15​​ 15071B​ ​Improvements to INDIAN TRAILS GOLF COURSE - Clubhouse Improvements and Maintenance Building Addition Inv to Bid.png $244,434.37​ M. DeClercq​
    11​/3/15​ ​15039 ​Septic System Replacement at the LAKE MICHIGAN FILTRATION PLANT Inv to Bid.png $320,000.00​ ​​J. McCaul​​
    ​10/20/15 ​15071A ​Improvements to INDIAN TRAILS GOLF COURSE - Range and Short Game Practice Area Inv to Bid.png $1,134,240.00​ M. DeClercq​
    ​10/2/15 15071​ ​Improvements to INDIAN TRAILS GOLF COURSE - New Irrigation System Inv to Bid.png $573,710.00​ M. DeClercq​
    ​10/1/15 ​15046 ​Improvements to Parking Ramps at VARIOUS LOCATIONS and at CALDER PLAZA - 2015 Inv to Bid.png ​$1,497,706.50​ ​​​​K. Enriquez​​​​
    9/11/15​ ​14090 ​Construction of a Storage Facility at the Police Outdoor Shooting Range at 1600 MARKET AVENUE SW Inv to Bid.png $303,982.05​ ​​​​K. Enriquez​​​
    8/25/15​​ 14087​ Construction of Sidewalk, Drive Approach, Curb, Curb and Gutter, and ADA Ramps at VARIOUS LOCATIONS – Contract No. 2015-03 Inv to Bid.png ​$234,625.00 ​​​​J. Hayes
    8/18/15​ ​15044 ​Rotomilling/Resurfacing of Streets at VARIOUS LOCATIONS - Contract 2015-4 Inv to Bid.png $3,785,490.00​ ​R. DeVries
    ​8/11/15 ​15051 ​Reconstruction of BRIDGE STREET from Winter Ave to Summer Ave and SUMMER AVENUE from Douglas St to Bridge St and WINTER AVENUE from 100' S of Bridge St to Bridge St Inv to Bid.png ​$889,910.25 D. Siminski​
    ​7/30/15 ​15035 Parking Lot Resurfacing in Burton Heights Area (2004 S Division, 23 Andre SW, 21 Cutler SW and 30 Burton SW) VARIOUS LOCATIONS Inv to Bid.png $238,271.00​ ​​​​K. Enriquez​​
    ​7/30/15 ​14094 Reconstruction of JEFFERSON AVENUE from Burton St. to Cottage Grove St. and Resurfacing of JEFFERSON AVENUE from Cottage Grove St. to 200' South of Hall St. Inv to Bid.png ​$2,611,946.00​ B. Stam​​​
    7/23/15​ ​15017 ​Reconstruction of COLLEGE AVENUE from Cottage Grove St to Oakdale St and Abandonment of Water Main in PARIS AVENUE (VACATED) from Cottage Grove St to 270' South of Oakdale Street Inv to Bid.png $648,405.50​ B. Stam​​
    ​7/14/15 ​14099 ​Storm Sewer Stabilization and Drainage Improvements at VARIOUS LOCATIONS-2015 Inv to Bid.png $191,485.00​ D. Siminski​
    6/23/15​ ​15006 ​Sidewalk Trip Hazard Remediation and Condition Survey at VARIOUS LOCATIONS Inv to Bid.png $40,000.00​ ​​​J. Hayes
    6/9/15​ ​15043 Rotomilling/Resurfacing of Streets at VARIOUS LOCATIONS - Contract 2015-3 Inv to Bid.png ​$1,879,560.00 ​R. DeVries
    ​6/2/15 14083​​ East Side Sewer Improvements Program Separation Project Contract No. 26C – Storm Water Storage and Treatment Improvements at MARY WATERS PARK and in COLLEGE AVENUE from 70’ North to 190’ North of Coldbrook St Inv to Bid.png $1,183,855.75​ ​R. DeVries
    ​5/28/15 ​15042 ​Rotomilling/Resurfacing of Streets at VARIOUS LOCATIONS - Contract 2015-2 Inv to Bid.png $2,014,620.00​ ​R. DeVries
    ​5/21/15 ​15040 ​Utility Improvements at VARIOUS LOCATIONS - Contract 2015 Inv to Bid.png N.A. ​​J. McCaul
    5/19/15​ ​14086 ​Construction of Sidewalk, Drive Approach, Curb, Curb & Gutter, and ADA Ramps at VARIOUS LOCATIONS - Contract 2015-02 Inv to Bid.png $136,275.00​ ​J. Hayes
    5/5/15​ ​15028 ​Rotomilling/Resurfacing of Streets at VARIOUS LOCATIONS - Contract 2015-1 Inv to Bid.png $2,193,790.00​ ​R. DeVries
    4/9/15​ 14044​ ​Reconstruction of BARTLETT STREET from Market Ave to Grandville Ave, FINNEY AVENUE from Wealthy St to Williams St and WILLIAMS STREET from Market Ave to Grandville Ave in Connection with Founders Brewing Company Expansion (TEDF-A Grant) Inv to Bid.png $2,576,271.50​ ​R. DeVries

    4/14/15​ ​14061B Improvements to CHERRY, ROOSEVELT, WESTOWN COMMONS and WILCOX PARKS Inv to Bid.png $1,001,683.00​ ​​​K. Enriquez​​
    4/14/15​ ​14061A ​Improvements to FULLER, GARFIELD, HIGHLAND and LINCOLN PARKS Inv to Bid.png $987,108.64​ ​​K. Enriquez​​
    3/10/15​ ​14035 ​Replacement of the Snowmelt System at the GOVERNMENT CENTER PARKING RAMP Inv to Bid.png $397,648.00​ ​​K. Enriquez
    2/24/15​ ​11042 ​Water Main Replacement in LAFAYETTE AVENUE from Coit Ave to Boltwood Dr and in WOODWARD AVENUE from Burton St to Boston St Inv to Bid.png $998,902.50​ B. Stam
    2/24/15​ ​15004 ​Crack, Joint and Concrete Pavement Repair at VARIOUS LOCATIONS - Contract No. 2015 Inv to Bid.png $815,232.00​ J. Hayes
    ​2/10/15 ​14015 ​Improvements to the Retaining Walls at the OAKHILL CEMETERY Inv to Bid.png $139,775.00​ ​​K. Enriquez
    ​1/27/15 14089​ ​Construction of Sidewalk, Drive Approach, Curb, Curb and Gutter, and ADA Ramps at VARIOUS LOCATIONS - Contract No. 2015-05 South Inv to Bid.png $112,395.00​ ​J. Hayes
    1/27/15​ 14088​ ​​Construction of Sidewalk, Drive Approach, Curb, Curb and Gutter, and ADA Ramps at VARIOUS LOCATIONS - Contract No. 2015-04 North Inv to Bid.png $112,395.00​ J. Hayes​
    ​1/27/15 14085​ ​Construction of Sidewalk, Drive Approach, Curb, Curb and Gutter, and ADA Ramps at VARIOUS LOCATIONS - Contract No. 2015-01 Inv to Bid.png $108,367.50​ J. Hayes
    1/27/15​ 14021​ ​Improvements at the FRANKLIN PUMP STATION Inv to Bid.png $1,054,000.00 J. McCaul
    1/27/15​ ​13066 ​Eastside Sewer Improvements Program Separation Project Contract No. 27 Inv to Bid.png $​9,222,715.00 J. McCaul
    1/08/15​ 13036​ ​Improvements to the Berms at the WASTEWATER TREATMENT PLANT Inv to Bid.png $1,938,955.00​ K. Enriquez
    ​1/13/15 13073A​ ​LIVINGSTON RESERVOIR Second Transmission Watermain (Contract No. 1A) Inv to Bid.png $3,025,496.00​ J. McCaul