The Engineering Department will generally recommend the award of a Contract to the Approving Authority (City Commission or other authority that will make the Contract award) within 30-45 days after bid opening. However, for a specific date that a project will be considered for award by the Approving Authority, please contact the Engineering Department at (616) 456-3060 and request to speak to the appropriate project manager.
PLEASE NOTE:
The Approving Authority reserves the right to award a Contract in the Approving Authority's best interest, and therefore, may select a Bidder other than the lowest.
The following is a list of the Bid Tabs for the most recent projects bid through the City Engineer's Office. Click on the selected project to view or print the associated bid tab.
Prior Year Bid Tabs: 2011 2010 2009
​Bid Date ​Project # ​Project Name ​Bid Tab
12/12/12 ​12065 Demolition of Buildings at VARIOUS LOCATIONS - Contract 2012-04 (1012 - 1014 Lafayette Avenue, S.E.; 1018 Lafayette Avenue, S.E. and 1135 Cromwell Avenue, S.E.)
10/23/12​ ​12051 Demolition of Buildings at VARIOUS LOCATIONS - Contract 2012-03 (2519 Longmeadow Street NW, 447 Franklin Street SE, 625 Lynch Street SW, and 724 Bates Street SE)
10/02/12​ ​12015 Concrete Restoration at the LAKE MICHIGAN FILTRATION PLANT – PHASE 7 & 8 (Repairs/Improvements to the LMFP)
09/25/12​ ​12045 CIPP Lining of Sanitary Sewers at VARIOUS LOCATIONS - Contract 2012
08/28/12​ ​11050 Construction of Sidewalk Ramps at VARIOUS LOCATIONS - Contract No. R-2012-1
08/28/12​ ​12032 Disconnection of Private Footing Drains and Installation of Sump Pumps and Backwater Valves at VARIOUS LOCATIONS - 2012 – 2015
08/07/12​ ​11056 Demolition and Removal of Sludge Storage Tanks and Appurtenant Structures at the WASTEWATER TREATMENT PLANT
07/17/12 ​12014 Restriping of FRONT AVENUE from Fourth St to Sixth St and Resurfacing of FRONT AVENUE from Sixth St to Leonard St
07/10/12​ ​12028 Streetscape Improvements in FULTON STREET from the Grand River to Division Ave
06/26/12​ ​12031 Demolition of Buildings at VARIOUS LOCATIONS - CONTRACT NO. 2012 - 02 (171 - 28th Street SE)
06/26/12​ ​11043 Building and Pumping Improvements to the EAST PARIS SERVICE CENTER
​06/26/12 ​03056C EASTSIDE SEWER IMPROVEMENTS PROGRAM SEPARATION PROJECT - CONTRACT NO. 2C
06/05/12​ ​11006 Reconstruction of LOGAN STREET from Division Ave to Jefferson Ave and JEFFERSON AVENUE from Logan St to Wealthy St
06/05/12​ ​11059 ​Improvements to the Electrical Substaion at the LIVINGSTION WATER PUMP STATION
06/05/12​ ​12027 Utility Improvements at VARIOUS LOCATIONS - Contract 2012
06/05/12​ ​12002 ​Resurfacing of Parking Lots at VARIOUS LOCATIONS - 2012
05/29/12​ ​12025 Demolition of Buildings at VARIOUS LOCATIONS - CONTRACT NO. 2012-01 (115 Gold Avenue SW, 28 Colfax Street NE, and 1356 Portland Avenue NE)
05/08/12​ ​12023 Concrete and Asphalt Repairs at the WASTEWATER TREATMENT PLANT - 2012
05/03/12​ ​11037B EASTSIDE SEWER IMPROVEMENTS PROGRAM SEPARATION PROJECT CONTRACT NO. 26B
05/03/12​ 12001 Renovate SE Stair Tower at GOVERNMENT CENTER PARKING RAMP
05/02/12​ ​09091 EASTSIDE SEWER IMPROVEMENTS PROGRAM SEPARATION PROJECT CONTRACT NO. 20
05/01/12​ ​10063 Reconstruction of IONIA AVENUE from Buckley St to Wealthy St, LOGAN STREET from US-131 to Division Ave, MCCONNELL STREET from Ionia Ave to Division Ave (URBAN MARKET)
04/27/12​ ​11037A EASTSIDE SEWER IMPROVEMENTS PROGRAM SEPARATION PROJECT CONTRACT NO. 26A
04/26/12​ ​12019 Miscellaneous Tuck Pointing of Mortar Joints at the CHESTER FIRE STATION – 2012
04/26/12​ ​12018 Remove and Replace Concrete Driveway at MONROE AVENUE FIRE STATION - 2012
04/17/12​ ​11028 ​Water Main Improvements in PATTERSON AVENUE and in Public Easement SE from 36th St to 33rd St
04/17/12​ ​11047 ​Fence Replacement on North side of FULTON STREET from Lafayette Ave to Prospect Ave
03/13/12 ​10001A Eastside Sewer Improvements Program Separation Project Contract No. 23A
03/06/12​ ​05032 Restoration of OAKES STREET from Market Ave to Ottawa Ave
03/06/12​ ​09040 ​Remove and Replace Roof at CITY HALL 2011
​03/01/12 ​11031 Geothermal (HVAC) Systems at VARIOUS LOCATIONS for the Grand Rapids Fire Department
02/28/12​ ​12007 Construction of Sidewalk, Drive Approach, Curb, Curb and Gutter at VARIOUS LOCATIONS - CONTRACT NO. 2012-01
02/28/12​ ​12008 Construction of Sidewalk, Drive Approach, Curb, Curb and Gutter at VARIOUS LOCATIONS - CONTRACT NO. 2012-02
​02/28/12 ​12009 Construction of Sidewalk, Drive Approach, Curb, Curb and Gutter at VARIOUS LOCATIONS - CONTRACT NO. 2012-03
​02/28/12 ​12010 Construction of Sidewalk, Drive Approach, Curb, Curb and Gutter at VARIOUS LOCATIONS - CONTRACT NO. 2012-04
​02/28/12 ​12011 Construction of Sidewalk, Drive Approach, Curb, Curb and Gutter at VARIOUS LOCATIONS - CONTRACT NO. 2012-05
​02/28/12 ​12012 Construction of Sidewalk, Drive Approach, Curb, Curb and Gutter at VARIOUS LOCATIONS - CONTRACT NO. 2012-06
02/28/12​ ​10048D Improvements in FULTON STREET, WORCESTER DRIVE, SOMERSET DRIVE, KENT BOULEVARD, BALTIMORE DRIVE and in PUBLIC EASEMENT (NE) (Maryland Estates)
02/23/12​ ​10020 ​ESCSO Contract No. 18 - UNION AVE; EVANS ST;JAMES AVE; HENRY AVE; Resurf. of UNION AVE
01/12/12 11061​ Improvements in FULTON STREET from the Grand River to Division Ave
Click the City Commission Information link to get agenda, minutes and e-package information.
For questions, contact the Engineer's Office at engineering@grcity.us, or 616-456-3060.