The Engineering Department will generally recommend the award of a Contract to the Approving Authority (City Commission or other authority that will make the Contract award) within 30-45 days after bid opening. However, for a specific date that a project will be considered for award by the Approving Authority, please contact the Engineering Department at (616) 456-3060 and request to speak to the appropriate project manager.
PLEASE NOTE:
The Approving Authority reserves the right to award a Contract in the Approving Authority's best interest, and therefore, may select a Bidder other than the lowest.
The following is a list of the Bid Tabs for the most recent projects bid through the City Engineer's Office. Click on the selected project to view or print the associated bid tab.
 
Bid Date Project #​ ​Project Name
Bid Tab
​11/29/11 ​11033 ​Improvements to Sanitary Sewer in THREE MILE ROAD and ERICKSON COURT INTERSECTION Green Check Mark 35.jpg
​10/25/11 ​08083 ​Skylight Replacement at 265 and 333 Market Avenue SW - RE-BID Green Check Mark 35.jpg
​10/18/11 ​10001B Eastside Sewer Improvements Program Separation Project Contract No. 23B Green Check Mark 35.jpg
​10/11/11 ​11004 ​Concrete Restoration at the LAKE MICHIGAN FILTRATION PLANT- PHASE 1A & 6 (Repairs/Improvements to the LMFP) Green Check Mark 35.jpg
​10/11/11 ​10017B ​ Installation of Photovoltaic Arrays at the WATER/ENVIRONMENTAL FACILITY Green Check Mark 35.jpg
​09/29/11 ​11048 ​Removal and Replacement of Stabilized Gravel at ROSA PARKS CIRCLE Green Check Mark 35.jpg
10/04/11 ​11049 ​Construction of Sidewalk, Drive Approach, Curb, Curb and Gutter at VARIOUS LOCATIONS Contract GR-2011 Green Check Mark 35.jpg
08/23/11 11045​ Demolition of Buildings at VARIOUS LOCATIONS - Contract No. 2011 - 02 (908 Nagold Street NW) Green Check Mark 35.jpg
​08/16/11 ​10064 Water Main Replacement in NORTH PARK STREET from Coit Ave to Eastern Ave and Reconstruction of EASTERN AVENUE from North Park St to 100’ north of Hubbard St Green Check Mark 35.jpg
​08/11/11 ​11003
Curb Replacement in DARWIN AVENUE from 275 ft south of Kirtland St to Stewart St
Green Check Mark 35.jpg
​08/09/11 ​11023 ​Improvements in BROADWAY AVENUE ALLEY from Fourth St to Sixth St Alley; CLOVER COURT from Broadway Ave Alley to Broadway Ave; and TURNER AVENUE from 165' South of Sixth St to Sixth St Green Check Mark 35.jpg
​07/21/11 ​09049 ​Construction of PATTERSON ELEVATED STORAGE TANK Green Check Mark 35.jpg
​07/14/11 ​09082 Reconstruction of WEST FULTON PARKING LOT Green Check Mark 35.jpg
​06/30/11 ​11030 EMERGENCY Demolition of Buildings at VARIOUS LOCATIONS – Contract No. 2011-01 (1911 Division Avenue S) Green Check Mark 35.jpg
​06/21/11 ​08083 ​Skylight Replacement at 265 and 333 MARKET AVENUE SW Green Check Mark 35.jpg
​06/21/11 ​10025 ​Replacement of LEONARD HEIGHTS SANITARY LIFT STATION and Sanitary Forcemain in REMEMBRANCE ROAD from Van Portfliet Dr (North) to 390' west of Stanwood Rd Green Check Mark 35.jpg
​06/16/11 ​10053 Improvements to the Pistol Range at the WASTEWATER TREATMENT PLANT Green Check Mark 35.jpg
06/16/11 ​09046 Restoration of Exterior Façade and Replacement of Door and Window Glass at CITY HALL Green Check Mark 35.jpg
​06/07/11 ​09054 ​Replacement of Flow Diversion Gates at the MARKET AVENUE PUMP STATION Green Check Mark 35.jpg
​06/07/11 ​09020 ​Reconstruction of LEXINGTON AVENUE from Butterworth St to Fulton St and BUTTERWORTH STREET from 150 ft W to 185 ft E of Lexington Ave and Improvement of SEWARD AVENUE from Watson St to Fulton St (U.S. ECONOMIC DEVELOPMENT ADMINISTRATION - U.S. EDA GRANT AWARD NO. 06-01-05495) Green Check Mark 35.jpg
​05/26/1 10048C Curb Drain Installation in EAST LEONARD HEIGHTS and MARYLAND ESTATES Green Check Mark 35.jpg
​05/24/11 ​10073 ​Improvements to the Ventilation Systems for the Screen Room and Replacement of Grit Blowers at the WASTEWATER TREATMENT PLANT Green Check Mark 35.jpg
​05/10/11 07029​ Reconstruction of GRANDVILLE AVENUE from Oakes St to Weston St Green Check Mark 35.jpg
​05/05/11 ​09058 ​Electrical Improvements to CITY HALL and KENT COUNTY ADMINISTRATION BUILDING Green Check Mark 35.jpg
​04/19/11 10067 Improvements to DEAN LAKE SERVICE CENTER Green Check Mark 35.jpg
​04/29/11 ​10054 ​Reconstruction of COLLEGE AVENUE from Crofton St to Cottage Grove St and Storm Sewer in COTTAGE GROVE STREET from College Ave to Union Ave Green Check Mark 35.jpg
​03/10/11 ​10003 ​Eastside Sewer Improvements Program Separation Project Contract No. 17 Green Check Mark 35.jpg
​02/22/11 ​11007 ​Sidewalk, Drive Approach, Curb, Curb and Gutter at VARIOUS LOCATIONS – CONTRACT NO. 2011-01 Green Check Mark 35.jpg
​02/22/11 11008 Sidewalk, Drive Approach, Curb, Curb and Gutter at VARIOUS LOCATIONS – CONTRACT NO. 2011-02 Green Check Mark 35.jpg
​02/22/11 ​11009 ​Sidewalk, Drive Approach, Curb, Curb and Gutter at VARIOUS LOCATIONS – CONTRACT NO. 2011-03 Green Check Mark 35.jpg
​02/22/11 ​11010 ​Sidewalk, Drive Approach, Curb, Curb and Gutter at VARIOUS LOCATIONS – CONTRACT NO. 2011-04 Green Check Mark 35.jpg
​02/22/11 ​11011 ​Sidewalk, Drive Approach, Curb, Curb and Gutter at VARIOUS LOCATIONS – CONTRACT NO. 2011-05 Green Check Mark 35.jpg
​02/22/11 ​11012 ​Sidewalk, Drive Approach, Curb, Curb and Gutter at VARIOUS LOCATIONS – CONTRACT NO. 2011-06 Green Check Mark 35.jpg
​02/15/11 ​10002 ​Eastside Sewer Improvements Program Separation Project Contract No. 16 Green Check Mark 35.jpg
​02/15/11 ​10068 ​Asbestos removal in connection with the HVAC/Plumbing Improvements to
CITY HALL and COUNTY BUILDING - 2011
Green Check Mark 35.jpg
​02/15/11 ​09014 ​Improvements to the HVAC and Plumbing System at VARIOUS LOCATIONS - 2009/2010 Green Check Mark 35.jpg
​02/01/11 ​10024 ​Replacement of MICHIGAN STREET SANITARY LIFT STATION Green Check Mark 35.jpg
​02/01/11 ​09109 ​New Variable Frequency Drive (VFD) for Pump #5 at the Low Lift Station #2 at the
LAKE MICHIGAN FILTRATION PLANT
Green Check Mark 35.jpg
​02/01/11 ​09012 ​Improvements to the North Secondary Treatment System at the WASTEWATER TREATMENT PLANT Green Check Mark 35.jpg
​01/25/11 ​07062 ​Water Main Replacement in VAN AUKEN STREET from Fuller Avenue to Kalamazoo Avenue Green Check Mark 35.jpg
​01/13/11 ​09065B HVAC Improvements to 726 Madison Avenue (PAUL I PHILLIPS GYM) - PHASE I Green Check Mark 35.jpg
Click the City Commission Information link to get agenda, minutes and e-package information.
For questions, contact the Engineer's Office at engineering@grcity.us, or 616-456-3060.