Navigate Up
Sign In

Departments

    Weston
    Road Design and Construction (Sheldon to LaGrave)
    Pending Construction


     
    Tentative Construction Schedule
    2018

    Survey
    Please click here take our quick project survey, or contact us at 616-456-3000 to do the survey over the phone, so you can share your suggestions for the project and about any flooding, water pressure issues, sanitary sewer backups, or existing sprinkler systems.   ​

    Design
    Many of the following design options are not decided upon and are meant to serve as a starting point for the meeting conversation. The project may:
    • reconstruct the road and return it to its existing configuration with sharrow pavement marking symbols.
    • install a new water main.
    • install new catch basins for stormwater.
    • replace the old brick street surface with a new brick surface.
    • upgrade sidewalks and corner ramps to meet the Americans with Disabilities Act standards.
    • add bike parking where needed.
    • upgrade the street lights, pending funding.
    • plant street trees to retain and soak stormwater into the ground to filter pollutants and reduce runoff entering natural bodies of water. 

    Business Guide
    As we work to improve the street, we understand that businesses are sensitive to construction. For this reason, we’ve created a guide containing tips and tricks for businesses during construction.

    Engagement History
    Concept Design Meeting
    10-12-17 at 5:30 p.m.
    Westminster Presbyterian Church
    47 Jefferson Avenue SE 
    Grand Rapids, MI 49503

     
    Contact Information 
    311 or 616-456-3000