Navigate Up
Sign In

Departments

    Wealthy​
    Reconstruction (Commerce to Division) 
    Pending Construction 2018


     
    Construction Schedule
    2018

    Survey
    Please take our quick project survey so we can know your suggestions for the project and about any flooding, water pressure issues, sanitary sewer backups, or existing sprinkler systems. Please visit surveymonkey.com/r/wealthy or contact us at the number above to do the survey over the phone.

    Design
    The following concept design is not decided upon and is meant to serve as a starting point for the meeting conversation. The design maintains the existing lane configurations and expands the parkways and sidewalks on Wealthy Street to better the pedestrian experience. The intersection of Old Wealthy and Wealthy is proposed to be eliminated for safety reasons. The new configuration of Old Wealthy will narrow and end the street west of Wealthy, maintain a sidewalk between Ionia and Wealthy, and install rain gardens to retain and soak stormwater into the ground to filter pollutants and reduce runoff entering natural bodies of water. Please see the image below.



    Engagement History
     
    Concept Design Meeting
    06-19-17 at 5:30 p.m.
    Herkimer Apartments Community Room
    309 Division Avenue S
    Grand Rapids, MI 49503

    Presentation 06-19-17

    Contact Infor​mation​
    311 or 616-456-3000