    Resurfacing (Michigan to Leonard)
    Project Summary
    This project resurfaced Plymouth between Michigan. Sidewalks were installed on both sides of the street where none previously existed to fills gaps in the sidewalk network and existing sidewalks and ramps were upgraded to be compliant with the Americans with Disabilities Act.Green infratructure included bioswales and infiltration basins were added to retain and soak stormwater into the ground to filter pollutants and reduce runoff entering natural bodies of water and new crosswalks were added at side street intersections. This work was completed in early July 2016.

    After




    Before



    Engagement History
    Construction Preparation

    Concept Design Meeting
    09-29-15 at 6 p.m.
    The Yankee Clipper Branch of the Grand Rapids Public Library   2025 Leonard Street NE
    Grand Rapids, MI 49505