    Resurfacing (Fuller to Hall)
    Complete 2016

    Project Summary
    This project resurfaced Kalamazoo and upgraded sidewalks and ramps to be compliant with the Americans with Disabilities Act. Work also included installing rain gardens and infiltration basins to retain and soak stormwater into the ground to filter pollutants and reduce runoff entering natural bodies of water. Bulb-outs were created at several intersections to create room for rain gardens, better define parking spaces, and lessen the crossing distance for people walking. Additionally, minor modifications were made to some side streets to replace angled intersections with T-intersections at Kalamazoo and sharrow symbols were added to the street. This work was completed in June 2016.

    After






    ​Engagement History
    Construction Preparation
    04-25-16 at 6 p.m.
    Living Word Christian Center
    1534 Kalamazoo Avenue SE
    Grand Rapids, MI 49507
     
    Presentation (04-25-16)
    Preferred Design Meeting
    09-14-15 at 6 p.m.
    Oakdale Park Church
    961 Temple SE
    Grand Rapids, MI 49507

    Concept Design Meeting
    08-17-15 at 6 p.m.
    Oakdale Park Church
    961 Temple SE
    Grand Rapids, MI 49507​


    Contact Information
     311 or 456-3000