    Reconstruction (28th to Walsh, and Eastern and Alger Intersection)
    Resurfacing (Walsh to Burton)
    Complete 2016

    Project Summary​
    This project reconstructed the road between 28th and Walsh, reconstructed the Eastern and Alger intersection, and resurfaced the road between Walsh and Burton. Sidewalks were upgraded to be compliant with the Americans with Disabilities Act and a pedestrian island was insland was installed to assist with street crossing south of Alger. Rain gardens were also installed to retain and soak stormwater into the ground to filter pollutants and reduce runoff entering natural bodies of water. ​Work was completed in August 2016.

    After






    Before




    ​Engagement History​
    Construction Preparation
    06-08-16 at 6 p.m.
    Alger Park Church
    2655 Eastern Avenue SE 
    Grand Rapids, MI 49507​


    Preferred Design Meeting
    02-11-16 at 6 p.m.
    Alger Park Church
    2655 Eastern Avenue SE
    Grand Rapids, MI 49507

    Presentation (02-11-16)

    Concept Design Meeting
    09-16-15 at 6 p.m.
    Alger Park Church
    2655 Eastern Avenue SE
    Grand Rapids, MI 49507

    Mailer (08-28-15)​