    Cotta​ge Grove
    Reconstruction (Buchanan to Division)
    Complete 2016


    Project Summary
    This project reconstructed the road, removed off-street parking bays on the south side of the road and created a parkway and installed an on-street parking lane. Work also included replacing the sidewalk on the south side of the road, upgrading sidewalks and ramps to be compliant with the Americans with Disabilities Act, and installing green infrastructure such as street trees and infiltration basins to retain and soak stormwater in to the ground to filter pollutants and reduce runoff entering natural bodies of water.

    After
     



    Before



    Engagement History 
    ​Construction Preparation
    City staff met with businesses located on Cottage Grove to discuss the project, including the proposed design and construction information.

    Contact Information 
    311 or 616-456-3000