Navigate Up
Sign In

Departments

    College
    Reconstruction (Cottage Grove to Oakdale)

    Project Summary
    This project resurfaced College and installed infiltration basins to manage stormwater. The work was completed during the 2015 construction season. 

    Design
    The project: 
    • replaced the existing water main with a larger one to allow the abandonment of a water main in the vacated portion of Paris Avenue so that Notions Marketing Corporation can construct a loading dock. The company is contributing to the cost of this project. 
    • reconstructed the road.
    • planted 25 street trees.
    • installed infiltration basins along the road edge to retain and soak stormwater into the ground to filter pollutants and reduce runoff entering natural bodies of water.
    • upgraded sidewalks and ramps to be compliant with the Americans with Disabilities Act.




    Engagement History
    Construction Preparation

    This picture shows the street in poor condition prior to construction.

    Contact Information 
    311 or 456-3000
    communityengagement@grcity.us