    Project Summary
    This project installed sidewalk on the east side of Turner (between Ann and the 131 soutbound on-ramp) and the south side of Ann (between Turner and the Grand River) to fill gaps in the pedestrian network. The pedestrian island on the south side of the Ann and Turner intersection was expanded and planted with vegetation. Ann was then resurfaced between Turner and Monroe.

    After






    Before