    Motorists and residents of Grand Rapids will clearly see the dramatic impact of the voter-approved Vital Streets measure this spring as work begins on 283 street projects around the City. With more than 45 miles of streets set to undergo preventative maintenance this year, on top of the 39 miles of streets that received similar maintenance last year, officials say that Grand Rapids’ pothole season should be shorter and more manageable.

     

    As implemented in the recently completed Michigan-Fuller Intersection project, officials have pledged increased engagement and sharing of information on City road construction projects to help residents navigate around increased construction activity. Project specifics will determine the scope of engagement. For instance, a simple treatment like cape sealing or low-impact resurfacing, where workers are in and out of an area in a day or two, may just call for notifying neighbors that workers will be in their area, while during the design stages of more major rehabilitation or reconstruction projects, with neighbors provided ample opportunity to learn and provide comment on the designs. 

     

    City engineers use an asset management system to prioritize roadway repairs--first protecting recent street investments by extending the life cycle of streets in fair condition. After completion of work on the fair to good roads, complete reconstruction and the major overhaul of roads in poor condition occurs to bring each up to complete street status.

     

    Engineering uses the Pavement Surface Evaluation & Rating System (PASER) method for visually rating the surface condition of a pavement from a scale of 1 to 10, with 1 being a pavement in a failed condition and 10 being a pavement in excellent condition.

     

    Pavements age with time and gradually deteriorate due to environmental effects and traffic loadings. Resources for maintaining and repairing roads can be efficiently managed so that the right place receives money at the right time by knowing the condition of the pavement network. The City of Grand Rapids has recognized the benefits of performing regular pavement condition surveys to evaluate the existing pavement conditions and to allocate maintenance and construction funds.

     

    The rate at which pavement deteriorates from an excellent (10) to a very poor condition (1) depends largely on its environment, traffic loading conditions, original construction quality, and interim maintenance procedures. Two pavements constructed at the same time may have significantly different lives, or certain portions of a pavement may deteriorate more rapidly than others, due to material or construction problems. Engineers consider future traffic projections, original construction and pavement strength and may choose a more comprehensive rehabilitation if required. On the other hand, it may be appropriate under certain conditions to let the pavement fully deteriorate before rebuilding when funds are available.

     

    Systematic Sidewalk Inspection Program

    This summer also begins a new sidewalk program that replaces the previous “Point of Sale” program where property owners were responsible for sidewalk maintenance and replacement.   Contracts are in place in three areas of the City where inspected sidewalks can be repaired as needed during the 2015 season.  The contract limits are flexible and expanded if funds allow after the initial areas are complete. The systematic contract areas will rotate each construction season on a 15-year schedule to cover the entire City.

     

    During the inspection phase, residents will see City inspectors walking the sidewalks while wearing bright colored vests. Inspectors will mark the sidewalk with spray paint to instruct the contractor.

     

    During the construction phase, the contractor will notify the property owner of the construction with a door hanger and coordinate work on sidewalk adjacent to driveways.

     

    Tree roots contribute to more than 60 percent of sidewalk issues.  The City’s Forester and the Urban Forestry Committee have been instrumental in the development of new construction specifications for repairing sidewalks around trees with a goal of limiting root pruning and damage to trees using ANSI A300 Standards, which are the generally accepted industry standards for tree care practices.

     

    Additionally, the City is also constructing new sidewalk to fill in gaps in the sidewalk network to provide transportation choices for people. The 2015 projects include the east side of Plainfield from 3 Mile to I-96 and the east side of Fuller from I-196 to the CSX railroad tracks.

     

    Vital Streets Oversight Commission

    The Vital Streets Oversight Commission (VSOC) presented a six-month update to the City Commission this past February. The VSOC is responsible for closely following Investment Guidelines, and closely monitoring and disclosing funds.

     

    VSOC representatives told the Commission that a major undertaking over the next year would be the development of a Vital Streets Master Plan to guide consistent street and sidewalk design principles into the future. The plan will consolidate complete street principles developed by the Sustainable Streets Task Force and endorsed by voters in May 2014 to ensure that bicycling, pedestrians, transit and freight, transportation demand management and green infrastructure facilities all fit within the right of way.

     

    The Vital Streets Master Plan will tie together previously used guiding documents to provide guidance for consistent design of Vital Streets. The Plan will embed these guidelines into the City’s ordinances, policies and procedures to ensure these future best practices.

     

    The Vital Streets Oversight Commission is a citizen board appointed by the City Commission to oversee vital street and sidewalk investments as promised when voters approved extending the income tax increase another 15 years for streets and sidewalks. VSOC ensures that Investment Guidelines are being carefully followed, while monitoring allocation of funds and reporting progress.

     

    State Investment in Vital Streets

    Grand Rapids’ investment in Vital Streets and Sidewalks depends on several sources of investment. All secured sources are performing well, except the required additional state investment of $6 million per year. 

     

    Michigan voters will have an opportunity to choose to provide additional state investment for streets this May when they consider Proposal 1. Approval of this plan would mean at least $9.5 million in new street investment for the City of Grand Rapids that would meet the total investment required to meet the City’s goal of returning 70 percent of local streets to good or fair condition in 15 years. It would also mean the long-awaited improvement of roads across Michigan.

     

    Without additional investment from the state, less than half (approximately 46 percent) of the city’s local, neighborhood streets will have been improved to either good or fair condition at the end of 15 years.

     

    State Proposal 1 would also provide additional investment for the City’s General Fund, such as Police and Fire Services, and Grand Rapids Public Schools.

     

    Work on implementing Vital Streets is now underway in Grand Rapids. For a complete list of road projects projected for the 2015/2016 Construction Season and definitions of the various types of road construction repair techniques, please see below or visit grcity.us.

     

    Vital Street Projects

     

    Note: This is a partial list of 2015 and 2016 various street construction projects with no start date set for these projects at time of publication. Additional street paving projects, conducted by Public Services, are still being identified and prioritized and are not included in the following list:

           11th Street - Tamarack Avenue to Widdicomb Avenue and Jennette (South) Avenue to Alpine Avenue – Rotomill/resurface

           11th Street - Seward Avenue to Quarry Avenue – Rotomill/resurface

           12th Street - Powers Avenue to Tamarack Avenue – Rotomill/resurface

           3rd Street - CSX Railroad to Broadway Avenue – Rotomill/resurface

           3rd Street - Valley Avenue to Garfield Avenue – Rotomill/resurface

           4th Street - Covell Avenue to Seward Avenue and Scribner Avenue to Front Avenue Street – Rotomill/resurface

           4th Street - Seward Avenue to Turner Avenue - Capeseal

           43rd Street - Eastcastle Drive to Breton Avenue – Rotomill/resurface

           5th Street - Lincoln Avenue to Powers Avenue (South) – Rotomill/resurface 

           5th Street - Stocking Avenue to Alpine Avenue – Rotomill/resurface

           A Street - Oakland Avenue to Grandville Avenue – Rotomill/resurface

           Alabama Avenue - Bridge Street to 1st Street – Rotomill/resurface

           Albany Street – Buchanan Avenue to Division Avenue – Reconstruction 

           Alexander Street – Calvin Avenue to Giddings Avenue – Rotomill/resurface

           Alger Street - Division Avenue to Madison Avenue - Capeseal

           Alice Avenue - Cutler Street to Burton Street and Cutler Street - Alice Avenue to St Charles Avenue – Capeseal 

           Alpine Avenue - Leonard Street to Richmond Street - Rotomill/resurface 

           Ames Street - Berlin Place to North Avenue – Reconstruction

           Ardmore Street – Giddings Avenue to Philadelphia Avenue – Rotomill/resurface

           Ball Avenue - Mason Street to Cedar Street and Knapp Street to Aberdeen Street - Capeseal

           Barclay Avenue - Lyon Street to Michigan Street - Rotomill/resurface

           Bartlett Street - Market Avenue to Grandville Avenue - Reconstruction

           Benjamin Avenue - Bates Street to Thomas Street - Rotomill/resurface

           Berlin Place - Ames Street to Quimby Street – Reconstruction

           Birchcrest Drive – 28th Street to Saginaw Road – Rotomill/resurface

           Bostwick Avenue – Library Place to Fountain Street – Rotomill/resurfacing

           Bostwick Avenue - Lyon Street to Crescent Street - Reconstruction

           Bradford Street - Coit Avenue to Lafayette Avenue – Reconstruction

           Bridge Street from Lake Michigan Drive to Mount Mercy Drive and from Valley Avenue to Summer Avenue - Rotomill/resurface

           Bristol Avenue - Walker Avenue to North City Limit - Capeseal

           Buchanan Avenue – Stevens Street to Hall Street - Reconstruction 

           Buckley Street - Ionia Avenue to 70' West of LaGrave Avenue – Crack Seal

           Buffalo Avenue - Page Street to Quimby Street – Reconstruction

           Cambridge Boulevard - Griggs Street to Orville Street – Rotomill/resurface/Watermain

           Camelot Drive - Lake Eastbrook Boulevard to Camelot Court and Charring Cross Drive to East Paris Avenue - Capeseal

           Campau Avenue - Monroe Avenue to Pearl Street – Crack Seal Clyde Park Avenue – Alger Street to Burton Street - Rotomill/resurface

           Canton Street – Buchanan to Division Avenue – Reconstruction

           Carlton Avenue - Lake Drive to Fulton Street – Reconstruction/rotomill/resurface

           Carman Avenue - Page Street to Spencer Street – Reconstruction

           Cedar Street - Clancy Avenue to Lafayette Avenue – Reconstruction

           Chamberlain Avenue – Mayberry Street to 28th Street – Rotomill/resurface

           Clancy Avenue - Cedar Street to North Creston Plaza Drive – Reconstruction 

           Clayston Street – Raybrook Avenue to East Beltline – Rotomill/resurface

           Clyde Park Avenue - McKendrick Street to Grandville Avenue - Capeseal

           Coit Avenue - 3 Mile Road to Kendalwood Street - Capeseal

           Coit Avenue - Market Avenue to South End - Capeseal

           Coit Avenue - Newberry Street to Bradford Street – Reconstruction

           Coit Avenue - Quimby Street to Sweet Street and Ann Street to 3 Mile Road - Rotomill/resurface

           Coldbrook Street - Division Avenue to Clancy Avenue – Rotomill/resurface

           Cole Avenue - Marietta Street to Sweet Street – Reconstruction

           College Avenue – Cottage Grove Street to Oakdale Street - Reconstruction

           College Avenue - More Street to Leonard Street - Rotomill/resurface

           College Avenue – Pleasant Street to Wealthy Street – Crack Seal

           College Avenue - Wealthy Street to Cherry Street - Reconstruction

           Collindale Avenue – South City Limit to Lake Michigan Drive – Rotomill/resurface

           Colrain Street - Division Avenue to Jefferson Avenue – Capeseal

           Commerce Avenue - Cherry Street to Fulton Street - Capeseal

           Commons Avenue - Delaware Street to Antoine Street and Delaware Street - Commons Avenue to Division Avenue – Capeseal

           Concord Avenue - Burton Street to Griggs Street – Rotomill/resurface

           Cottage Grove Street - Buchanan Avenue to Division Avenue – Reconstruction

           Cottage Grove Street - Division Avenue to Jefferson Avenue – Rotomill/resurface

           Covell Avenue - Bridge Street to Leonard Street - Capeseal

           Crescent Street - Barclay Avenue to Lafayette Avenue – Rotomill/resurface/Watermain

           Crescent Street - Ionia Avenue to Division Avenue – Crack Seal

           Curtis Street - North Avenue to College Avenue – Reconstruction

           Cutler Street - Jerome Avenue to Darwin Avenue – Capeseal

           Davis Avenue - 11th Street to 12th Street - Capeseal

           Davis Avenue - 4th Street to 5th Street and 6th Street to 7th Street - Capeseal

           Delaware Street - Division Avenue to Sheldon Avenue – Rotomill/resurface

           Delaware Street - Sheldon Avenue to Jefferson Avenue – Rotomill/resurface

           Detroit Street - West End to Division Avenue – Capeseal

           Dewey Avenue - 3rd Street to 4th Street - Capeseal

           Diamond Avenue - Cherry Street to Crescent Street - Capeseal

           Diamond Avenue - Crescent Street to Michigan Street – Rotomill/resurface

           Diamond Avenue - Eleanor Street to Aberdeen Street - Capeseal

           Dickinson Street - Buchanan Avenue to Division Avenue – Capeseal

           Division Avenue – N. Division Avenue to Michigan Street – Rotomill/resurface

           Dorchester Avenue – Hall Street to Oxford Street – Reconstruction

           Dunham Street - Benjamin Avenue to Giddings Avenue – Rotomill/resurface

           E. Park Place – Fulton Street to Library Place – Rotomill/resurface 

           E. Service/Terminal Crescent Drive - S. Service Drive to Hall Street - Capeseal

           Eastcastle Drive - 44th Street to Breton Avenue – Rotomill/resurface

           Eastern Avenue – Crescent Street to Mid Michigan Railroad - Reconstruction

           Eastern Avenue - Franklin Street to Wealthy Street - Crackseal

           Eastern Avenue - Wealthy Street to Cherry Street – Rotomill/resurface

           Eastern Avenue - Cherry Street to Fulton Street - Capeseal

           Eastern Avenue - Oakdale Street to Hall Street – Rotomill/resurface​

           Elmdale Street - Eastern Avenue to Cheney Avenue - Capeseal

           Eton Street - Merrill Avenue to Norwich Avenue – Capeseal

           Evergreen Street – Union Avenue to Eastern Avenue – Rotomill/resurface 

           Fairbanks Street - Lafayette Avenue to Prospect Avenue – Capesel

           Fairbanks Street - Livingston Avenue to Coit Avenue – Capeseal

           Fairview Avenue - Hastings Street to Trowbridge Street – Capeseal

           Feakin Avenue - Griggs Street to Brown Street - Capeseal

           Fern Avenue/Florence Street – Reconstruction

           Fernando Street - North Avenue to College Avenue - Reconstruction 

           Finney Avenue - Bartlett Street to Williams Avenue – Reconstruction

           Finney Avenue - Wealthy Street to Goodrich Street – Rotomill/resurface

           Forrest Avenue - Quimby Street to Sweet Street – Reconstruction

           Fountain Street - Ghilda Place to Prospect Avenue and College Avenue to Langdon Avenue - Rotomill/resurface

           Fountain Street - Ottawa Avenue to Prospect Avenue - Capeseal

           Franklin Street - Division Avenue to Fuller Avenue - Capeseal

           Franklin Street - Oakland Avenue to Grandville Avenue – Rotomill/resurface

           Frederick Avenue - Atlantic Street to Walker Avenue - Capeseal

           Fremont Avenue - 11th Street to 12th Street - Capeseal

           Fremont Avenue - 2nd Street to 3rd Street – Rotomill/resurface

           Front Avenue - 4th Street to 6th Street – Rotomill/resurface

           Front Avenue - Wealthy Street to Watson Street - Rotomill/resurface Fuller Avenue - Evangeline Street to Michigan Street - Capeseal

           Fuller Avenue – Leonard Street to Knapp Street - Rotomill/resurface

           Fuller Avenue - Franklin Street to Wealthy Street - Capeseal

           Fuller Avenue - Wealthy Street to Baldwin Street - Capeseal

           Fulton Street – College Avenue to Union Avenue/Lake Drive – Reconstruction

           Fulton Street – Diamond Avenue to Fuller Avenue – Rotomill/resurface

           Fulton Street – Fuller Avenue to Carlton Avenue – Rotomill/resurface

           Fulton Street – Lafayette Avenue to College Avenue – Rotomill/resurface

           Fulton Street – Wallinwood Avenue to Sunnybrook Drive - Rotomill/resurface

           Garden Street - Division Avenue to Madison Avenue – Crack Seal

           Garfield Avenue - Leonard Street to Richmond Street – Rotomill/resurface

           Garfield Avenue - Walker Avenue to 11th Street - Capeseal 

           Gibson Place - Alexander Avenue to Kalamazoo Avenue – Rotomill/resurface 

           Giddings Avenue - Boston Street to Adams Street – Rotomill/resurface

           Gladstone Drive – Hiawatha Drive to Hall Street - Capeseal

           Godwin Avenue - Rosemary Street to 120' East of Brooklane Street – Capeseal

           Graham Street - West End to Division Avenue – Capeseal

           Grant Street - Buchanan Avenue to Ionia Avenue – Capeseal

           Griggs Street – Buchanan Avenue to Madison Avenue – Rotomill/resurface

           Griggs Street - Newark Avenue to Kalamazoo Avenue - Capeseal

           Hall Street - East of Buchanan Avenue to Division Avenue - Capeseal

           Hall Street - Eastern Avenue to Butler Avenue – Capeseal

           Hall Street – Freeman Avenue to Grandville Avenue – Rotomill/resurface

           Hastings Street - Clancy Avenue to Lafayette Avenue - Capeseal

           Hayden Street - Woolsey Drive to Norwich Avenue - Capeseal

           Hanover Street/Fern Avenue – Reconstruction 

           Home Street – Ionia Avenue to Division Avenue - Reconstruction 

           Hovey Street - Gunnison Avenue to Straight Avenue – Capeseal

           Hoyt Street - Madison Avenue to College Avenue - Capeseal

           Hutchinson Avenue - Orville Street to Boston Street – Rotomill/resurface/Watermain

           Ionia Avenue - Franklin Street to Pleasant Street - Capeseal

           Ionia Avenue – Stevens Street to Albany Street - Reconstruction 

           Jefferson Avenue - Aurora Street to Burton Street - Capeseal

           Jefferson Avenue - Burton Street to Crofton Street – Reconstruction

           Jefferson Avenue - Crofton Street to LaBelle Street – Rotomill/resurface

           Jefferson Avenue - LaBelle Street to Hall Street – Rotomill/resurface

           Kalamazoo Avenue - 36th Street to 200' North of Shangrai-La Drive – Capeseal

           Kalamazoo Avenue – 42nd Street to 36th Street - Capeseal

           Kalamazoo Avenue – 44th Street to 42nd Street – Rotomill/resurface

           Kalamazoo Avenue – Burton Street to Boston Street - Rotomill/resurface

           Kalamazoo Avenue – Boston Street to Hall Street - Rotomill/resurface

           Kensington Avenue - Curve Street to Oxford Street – Capeseal

           Kirtland Street - West End to Stafford Avenue – Capeseal

           Knapp Street - Dean Lake Avenue to East City Limits - Capeseal

           La Belle Street – Ionia Avenue to Division Avenue - Reconstruction 

           La Grave Avenue - Buckley Street to Wealthy Street – Rotomill/resurface/Watermain

           La Grave Avenue – Goodrich Street to Fulton Street – Rotomill/resurface

           La Grave Avenue - Wealthy Street to Goodrich Street – Crack Seal

           Lafayette Avenue - 500' South of Bradford Street to Leonard Street – Reconstruction

           Lafayette Avenue – Brown Street to Montgomery Street – Rotomill/resurface

           Lafayette Avenue - Coit Avenue to Boltwood Drive – Rotomill/resurface/Watermain

           Lafayette Avenue - Page Street to Plainfield Avenue – Reconstruction

           Laurel Avenue - Heather Drive to Elmwood Drive – Rotomill/resurface

           Leonard Street – Alpine Avenue to Turner Avenue - Rotomill/resurface

           Leonard Street – Covell Avenue to Walker Avenue - Rotomill/resurface 

           Leonard Street – Hillburn Avenue to Country Club Drive - Rotomill/resurface 

           Leonard Street - Lafayette Avenue to Ashland Avenue – Reconstruction

           Leonard Street – Oakleigh Avenue to Covell Avenue - Rotomill/resurface 

           Leonard Street – Plainfield Avenue to Lafayette Avenue - Rotomill/resurface

           Leonard Street – White Avenue to Powers Avenue - Rotomill/resurface 

           Liberty Street - Grandville Avenue to Century Avenue – Rotomill/resurface

           Library Street - Division Avenue to Ransom Avenue – Rotomill/resurface

           Lincoln Avenue - 11th Street to 12th Street – Rotomill/resurface

           Linden Avenue – Dickinson Street to Cottage Grove Street – Rotomill/resurface

           Livingston Avenue - Newberry Street to Livingston Pumping Station – Reconstruction

           Logan Street - Benjamin Avenue to Giddings Avenue – Crack Seal

           Logan Street - Diamond Avenue to Barth Avenue – Crack Seal

           Logan Street - Eureka Avenue to Diamond Avenue – Rotomill/resurface/Watermain

           Logan Street - Grandville Avenue to Century Avenue – Crack Seal

           Logan Street - James Avenue to Henry Avenue – Crack Seal

           Lotus Avenue – Griggs Street to Boston Street - Capeseal

           Lyon Street - College Avenue to Union Avenue - Capeseal

           Lyon Street - Lafayette Avenue to College Avenue - Capeseal

           Madison Avenue - Alger Street to Burton Street - Capeseal

           Marietta Street - North Avenue to College Avenue – Reconstruction

           Martin Avenue - Hoyt Street to Winchell Street – Capeseal

           Maryland Avenue - Kent Boulevard to I-196 - Capeseal 

           Matilda Street - Coit Avenue to Prospect Avenue - Capeseal

           Maude Avenue - Page Street to Spencer Street – Reconstruction

           McDonald Street - Bristol Avenue to Walker Avenue - Capeseal

           McReynolds Avenue - 4th Street to 7th Street – Rotomill/resurface 

           Merrill Avenue - Eton Street to Oxford Street - Capeseal

           Michigan Street from College Avenue to Eastern Avenue – Rotomill/resurface

           Milwaukee Avenue - 3rd Street to 4th Street – Capeseal

           Monroe Avenue – Fulton Street to Louis Street – Rotomill/resurface

           Montgomery Street - Jefferson Avenue to Lafayette Avenue – Rotomill/resurface

           Morris Avenue - Wealthy Street to Cherry Street – Rotomill/resurface

           Muskegon Avenue - 5th Street to 7th Street - Capeseal 

           N. Terminal Crescent - W. Service Drive to E. Service Drive – Capeseal

           National Avenue - Emperor Street to Butterworth Street – Capeseal

           National Avenue - Lake Michigan Drive to Sibley Street – Reconstruction

           Nelson Avenue – Kalamazoo Avenue to Burton Street – Rotomill/resurface

           Newberry Street - Livingston Avenue to Coit Avenue – Reconstruction

           Newberry Street - Monroe Avenue to Bond Avenue - Capeseal

           North Avenue - Page Street to Sweet Street – Reconstruction

           Oakdale Street - Eastern Avenue to Kalamazoo Avenue – Reconstruction

           Oakdale Street – Madison Avenue to Eastern Avenue – Rotomill/resurface

           Oakland Avenue – B Street to Franklin Street - Reconstruction

           Oakland Avenue - Franklin Street to Wealthy Street – Rotomill/resurface/Watermain

           Oakwood Avenue - Ann Street to Knapp Street – Crack Seal

           Oak Industrial Drive - Maryland Avenue to Leffingwell Avenue – Rotomill/resurface 

           Osgood Place - Pleasant Street to North End – Rotomill/resurface

           Oxford Street – Dorchester Avenue to Godfrey Avenue – Rotomill/resurface

           Palace Avenue - South End to Burton Street – Capeseal

           Paris Avenue – Michigan Street to North End - Reconstruction

           Pearl Street - Mount Vernon Avenue to Front Avenue – Reconstruction

           Pearl Street – West of Campau Avenue to Ottawa Avenue – Rotomill/resurface

           Pine Avenue - 10th Street to 12th Street - Capeseal

           Plainfield Avenue Alley (E) from Hanover St to Hanover St Alley (N) – Reconstruction

           Plainfield Avenue – Dean Street to 3 Mile Road – Rotomill/resurface

           Pleasant Street - Division Avenue to Cornwall Avenue – Capeseal

           Plymouth Avenue - Alger Street to Burton Street - Rotomill/resurface

           Plymouth Avenue - Boston Street to Hall Street - Capeseal 

           Plymouth Terrace - Adams Street to Hutchinson Street – Rotomill/resurface/Watermain

           Putnam Street – West End to Division Avenue – Reconstruction

           Quimby Street - Plainfield Avenue to College Avenue – Reconstruction

           Randoph Avenue – Stevens Street to Hall Street - Reconstruction 

           Rena Street – Ionia Avenue to Division Avenue - Reconstruction 

           Rennslaer Street - VanBuren Avenue to White Avenue - Capeseal

           Ritzema Court - West Dead End to 200' West of Grandville Avenue - Capeseal

           Robinson Road - Lake Drive to Youell Avenue - Capeseal

           Rosemary Street - Division Avenue to Madison Avenue and Jefferson Avenue - 28th Street to Rosemary Street – Capeseal

           Rumsey Street - Grandville Avenue to Sheridan Avenue – Rotomill/resurface

           Scribner Avenue - 4th Street to 6th Street - Capeseal 

           Saginaw Road – Birchcrest Drive to Woodmeadow Drive – Rotomill/resurface

           Seward Avenue - Fulton Street to Leonard Street - Capeseal

           Shelby Street – West End to Division Avenue – Reconstruction

           Sheldon Avenue - Buckley Street to Wealthy Street – Crack Seal

           Sheldon Avenue - Delaware Street to Sycamore Street – Crack Seal

           Sheldon Avenue - Haifley Place to Buckley Street – Crack Seal

           Sheldon Avenue - Highland Street to Delaware Street – Crack Seal

           Sheldon Avenue - Weston Street to Fulton Street and Weston Street - LaGrave Avenue to Sheldon Avenue – Reconstruction (Pending)

           Sherman Street - Eastern Avenue to Giddings Avenue – Crack Seal

           Sherman Street - Fuller Avenue to Giddings Avenue - Capeseal

           Sherman Street - Henry Avenue to Eastern Avenue – Crack Seal

           Shirley Street - 100' North of North Avenue to College Avenue - Capeseal

           Spencer Street - Plainfield Avenue to College Avenue - Reconstruction 

           State Street - Jefferson Avenue to Lafayette Avenue - Reconstruction

           St. Charles Avenue - Kirtland Street to Burton Street – Capeseal

           Steele Avenue - Towner Street to Hall Street – Rotomill/resurface

           Stocking Avenue - Bridge Street to 7th Street - Rotomill/resurface

           Straight Avenue – Fulton Street to Lake Michigan Drive – Reconstruction

           Straight Avenue - Jackson Street to Chatham Street – Crack Seal

           Sweet Street - 380' East of Coit Avenue to College Avenue – Rotomill/resurface

           Sycamore Street - Lafayette Avenue to Madison Avenue – Rotomill/resurface

           Sylvan Avenue - Boston Street to Adams Street – Rotomill/resurface/Watermain

           Taylor Avenue - Grove Street to Sweet Street – Reconstruction 

           Thompson Court - Sycamore Street to Pleasant Street - Capeseal

           Turner Avenue - Ann Street to Southbound US-131 Ramps – Rotomill/resurface

           Turner Avenue - US131 (Near Leonard Street) SB Off Ramp to GR&E RR – Capeseal

           Union Avenue – Fountain Street to Lyon Street – Rotomill/resurface

           Van Buren Avenue - 10th Street to 11th Street and Walker Avenue to Rennnslaer Street - Capeseal

           Various Locations: Concrete Repair – 

           Michigan Street – Grand River to Monroe Avenue

           Burton Street and Century Avenue Intersection

           Fulton Street and Diamond Avenue Intersection

           Fulton Street and Fuller Avenue Intersection including lane repair in Fuller Avenue at Evangeline Street

           Alger Street and Division Avenue Intersection

           Breton Avnue – 29th Street to 28th Street

           Market Avenue – Wealthy Street to Fulton Street

           Michigan Street and Fuller Avenue Intersection – (Full Closure)

           Michigan Street – Ottawa Avenue to Bostwick Avenue              

           Vilas Street - LaBelle Street to Home Street – Capeseal

           Vries Street - Roy Avenue to Century Avenue – Capeseal

           W. Service Drive - S. Service Drive to Terminal Crescent – Capeseal

           Walnut Street - North Avenue to College Avenue – Capeseal

           Washington Street - State Street to Lafayette Avenue - Capeseal

           Watson Street - Valley Avenue to Garfield Avenue - Capeseal

           Wealthy Street - Sheldon Avenue to Jefferson Avenue – Capeseal 

           Weston Street – Grandville Avenue to Ottawa Avenue - Rotomill/resurface

           Williams Street - Market Avenue to Grandville Avenue – Reconstruction

           Willard Avenue - Billantau Street to Mulford Drive – Capeseal

           Winter Avenue - Fulton Street to Lake Michigan Drive – Crack Seal

           Winter Avenue - Lake Michigan Drive to Bridge Street – Rotomill/resurface

           Winter Avenue - Watson Street to Fulton Street – Rotomill/resurface

           Withey Street - Division Avenue to Horton Avenue – Capeseal 

           Woodward Avenue - Burton Street to Boston Street – Rotomill/resurface/Watermain

           Woolsey Avenue - Eton Street to Oxford Street - Capeseal

           Zeno Street – Ionia Avenue to Division Avenue - Reconstruction



    Various types of road construction repair techniques:


    CAPE SEAL/WEDGING/PAVING

     

    Cape Seal Process: (Cape Seal)

    Major and Local Streets receive this treatment in an effort to preserve each for approximately 7-10 years. The treatment consists of placing a ½” asphalt micro-surface over an existing asphalt street. The process generally takes less than one day to complete. The contractor performing the work must place notifications at the affected residences 24-hours before work begins informs residents that they cannot drive on the new material until it has hardened and dried. This typically takes several hours.

     

    Prior to Cape Sealing the Public Services Department will patch potholes and spray patch (hot emulsion and stone application) failing areas of the street to place a lower level of protection below the new Cape Seal surface to protect the investment. Sweeping the entire street follows this, and then the contractor applies the Cape Seal at a later date.

     

    Hot Asphalt Wedging Process: (Wedging)

    This treatment typically involves placing an inch of Hot Asphalt materials over badly fatigued and failing areas prone to pothole development. This application limits pothole development and holds the road together for a few more years until more significant work can be accomplished.

     

    Hot Asphalt Overlay Process: (Resurfacing) (Mill & Fill)

    This process involves placing a new hot asphalt surface over the entire street or possibly just the driving lanes in some cases. These processes hold a street together for approximately 7-10 years when the street receives a new 1 to 1 ½” over-lay curb to curb.

     

    A mill and fill consists of workers removing (milling) the existing asphalt surface and add (filling) a 1 ½” over-lay crews preserve the street for, approximately, an additional 10-15 years. When engineers apply a 3” mill and fill, they hope to increase the life cycle of the road up to 20 years. After the removal of asphalt, the surface is thoroughly swept and adjustments made to the structure before or after the placement of the new asphalt. The selection process to determine street priority and selected treatment is very scientific and based upon the PASER rating and the perceived existing condition of the sub-surface utilities i.e. is the sub-grade adequate or do the water mains and/or sanitary sewer or storm systems need replacement? Engineers consider all of these factors prior to making these types of decisions.

     

    Crack Sealing: (Over-banding)

    This process involves placing a 3-inch wide hot asphalt seal over a visible crack in the asphalt or concrete. Applied crack sealing keeps as much water out of the subgrade as possible. Stress cracks can appear as soon as one year after a street is rebuilt. This is not unusual in the type environment we experience in the Great Lakes region. This preventive maintenance measure provides water protection. It does not provide any structure improvement to the pavement.